The following roadworks are taking place in Plymouth between Saturday 10 and Saturday 17 August.
STARTING THIS WEEK
Budshead Road | Monday 12 and Tuesday 13 August Three-way signals at Whitleigh Green junction, 9.30am to 3.30pm Telecom works Hutchison 3G Ltd
|
Chapel Street (Greenbank) | Monday 12 to Friday 23 August Road closed, 24 hours a day Supply disconnection National Grid
|
Finnigan Road | Monday 12 August to Wednesday 4 September One lane closed (with contraflow) between Laira Bridge Road and Faraday Road, 24 hours a day Work to remove loose vegetation and rock Safemark Highways
|
Horn Cross Road | Monday 12 to Friday 16 August Two-way signals opposite McMullin Motors, 9.30am to 3.30pm Bus shelter works Clear Channel
|
Lanhydrock Road | Monday 12 August Road closed between numbers 12 and 78, 8am to 5pm Sewer pipe cleaning South West Water
|
Leigham/Marsh Mills (eastbound) | Monday 12 August One lane closed on slip road from Leigham Roundabout to Marsh Mills, 9.30am to 3pm Digital sign replacement SWARCO
|
Longbridge Road | Monday 12 August Two-way signals near Leigham Manor Drive junction, 7pm to midnight Manhole works Plymouth City Council
|
Mannamead Road (inbound) | Monday 12 to Friday 16 August One lane closed on approach to Eggbuckland Road, 9.30am to 3.30pm Bus shelter works Clear Channel
|
Miller Way | Monday 12 to Friday 16 August Two-way signals outside number 186, 9.30am to 3.30pm Bus shelter works Clear Channel
|
Southway Drive | Monday 12 to Friday 16 August Four-way signals at Pendeen Crescent junction, 9.30am to 3.30pm Bus shelter works Clear Channel
|
Stonehouse Bridge (inbound) | Monday 12 to Friday 23 August One lane closed, 24 hours a day Manhole works South West Water
|
Billacombe Road (inbound) | Tuesday 13 to Thursday 15 August One lane closed opposite Hillside Crescent, 7pm to 11.30pm Manhole works BT
|
Embankment Road (outbound) | Tuesday 13 August One lane closed from Lanhydrock Road to Arnolds Point, 7pm to midnight Manhole works Plymouth City Council
|
Gdynia Way (inbound) | Tuesday 13 August One lane closed on approach to Cattedown Road bridge, 9.30am to 3pm Digital sign replacement SWARCO
|
Bracken Lane/Plymbridge Lane | Wednesday 14 August Two-way signals at rear of Mercedes-Benz, 7pm to 10pm Street lighting works Plymouth City Council
|
Frogmore Avenue | Wednesday 14 to Wednesday 28 August Three-way signals at Orchard Avenue junction, 24 hours a day Gas main works Wales and West Utilities
|
Plymouth Road (inbound) | Wednesday 14 August One lane closed near Sainsbury’s exit slip, 9.30am to 3pm Digital sign replacement SWARCO
|
The Hoe/Jennycliff | |
Underwood Road | Wednesday 14 August Road closed between Kennel Hill and Underlane, 7pm to 9pm Patch repairs Plymouth City Council
|
Stuart Road (eastbound) | Thursday 15 August One lane closed on approach to Pennycomequick Roundabout, 7pm to 10pm Lit sign repair works Plymouth City Council
|
CURRENT/ONGOING WORKS | |
Beaumont Road | Until Friday 16 August Two-way signals between Gasking Street and White Friars Lane, 24 hours a day (manually controlled at peak times) Drainage works Plymouth City Council
|
Chapel Street (Devonport) | Until Friday 6 September Rolling multi-way signals from Park Avenue to St Aubyn Vicarage, 24 hours a day (manually controlled at peak times) Gas main works Wales and West Utilities
|
Church Hill Road | Until Friday 23 August (not including Wednesday 14 or Thursday 15 August) Rolling two-way signals from Jennycliff Lane to Tapson Drive, 6am to 10pm Footway works Plymouth City Council
|
Colin Campbell Court | Until Sunday 1 December Road closed at rear of Stroll on Baby, 24 hours a day Works for new community diagnostic centre DA Giles Ltd
|
Derriford Road (westbound) | Until Tuesday 13 August Bus lane closed on approach to Plymbridge Lane, 24 hours Gas main works Wales and West Utilities
|
Laira Rail Bridge | Until Friday 19 November Footway/cycleway closed, 24 hours a day Remedial works Plymouth City Council
|
New George Street | Until Friday 4 October Road closed between Old Town Street and Tesco Metro, 24 hours a day City Centre Improvement Scheme Morgan Sindall
|
New Street (Barbican) | Until Tuesday 13 August Road closed, 24 hours a day Shopfront repairs Penquite Construction
|
Old Town Street | Until Friday 4 October Road closed, 24 hours a day City Centre Improvement Scheme Morgan Sindall
|
Phoenix Street (southbound) | Until Saturday 30 November Road closed from Sawrey Street to Millbay Road, 24 hours a day Remodelling ISG Construction Ltd
|
Plymstock Road | Until Tuesday 13 August Two-way signals outside number 96, 9am to 3pm Meter installation South West Water
|
Savage Road | Until Wednesday 30 April 2025 Road closed between Kelly Close and Talbot Gardens, 24 hours a day Regeneration works Fred Champion Groundworks Ltd
|
Tavistock Road (outbound) | Until 4am on Sunday 11 August (nights) Rolling lane closures from approach to Southway Drive to The Court and then from Woolwell Roundabout to Eco Way (all access maintained), 8pm to 4am Cable recovery BT
|
View all current and proposed works on the network on the roadworks map.
This news story has been produced by Chesil Radio's News Team, for more information please visit: https://www.chesilradio.com
Comments