top of page
  • Writer's pictureNikki Latham

Plymouth Roadworks W/C 10th August 2024

The following roadworks are taking place in Plymouth between Saturday 10 and Saturday 17 August.

 

STARTING THIS WEEK

Budshead Road

Monday 12 and Tuesday 13 August

Three-way signals at Whitleigh Green junction, 9.30am to 3.30pm

Telecom works

Hutchison 3G Ltd

 

Chapel Street (Greenbank)

Monday 12 to Friday 23 August

Road closed, 24 hours a day

Supply disconnection

National Grid

 

Finnigan Road

Monday 12 August to Wednesday 4 September 

One lane closed (with contraflow) between Laira Bridge Road and Faraday Road, 24 hours a day

Work to remove loose vegetation and rock

Safemark Highways

 

Horn Cross Road

Monday 12 to Friday 16 August 

Two-way signals opposite McMullin Motors, 9.30am to 3.30pm

Bus shelter works

Clear Channel

 

Lanhydrock Road

Monday 12 August 

Road closed between numbers 12 and 78, 8am to 5pm

Sewer pipe cleaning

South West Water

 

Leigham/Marsh Mills (eastbound)

Monday 12 August 

One lane closed on slip road from Leigham Roundabout to Marsh Mills, 9.30am to 3pm

Digital sign replacement

SWARCO

 

Longbridge Road

Monday 12 August

Two-way signals near Leigham Manor Drive junction, 7pm to midnight

Manhole works

Plymouth City Council

 

Mannamead Road (inbound)

Monday 12 to Friday 16 August 

One lane closed on approach to Eggbuckland Road, 9.30am to 3.30pm

Bus shelter works

Clear Channel

 

Miller Way

Monday 12 to Friday 16 August 

Two-way signals outside number 186, 9.30am to 3.30pm

Bus shelter works

Clear Channel

 

Southway Drive

Monday 12 to Friday 16 August 

Four-way signals at Pendeen Crescent junction, 9.30am to 3.30pm

Bus shelter works

Clear Channel

 

Stonehouse Bridge (inbound)

Monday 12 to Friday 23 August 

One lane closed, 24 hours a day

Manhole works

South West Water

 

Billacombe Road (inbound)

Tuesday 13 to Thursday 15 August

One lane closed opposite Hillside Crescent, 7pm to 11.30pm

Manhole works

BT

 

Embankment Road (outbound)

Tuesday 13 August

One lane closed from Lanhydrock Road to Arnolds Point, 7pm to midnight

Manhole works

Plymouth City Council

 

Gdynia Way (inbound)

Tuesday 13 August

One lane closed on approach to Cattedown Road bridge, 9.30am to 3pm

Digital sign replacement

SWARCO

 

Bracken Lane/Plymbridge Lane

Wednesday 14 August

Two-way signals at rear of Mercedes-Benz, 7pm to 10pm

Street lighting works

Plymouth City Council

 

Frogmore Avenue

Wednesday 14 to Wednesday 28 August

Three-way signals at Orchard Avenue junction, 24 hours a day

Gas main works

Wales and West Utilities

 

Plymouth Road (inbound)

Wednesday 14 August

One lane closed near Sainsbury’s exit slip, 9.30am to 3pm

Digital sign replacement

SWARCO

 

The Hoe/Jennycliff

Wednesday 14 and Thursday 15 August

Various road closures

British Firework Championships

Plymouth City Council

 

Underwood Road

Wednesday 14 August

Road closed between Kennel Hill and Underlane, 7pm to 9pm 

Patch repairs

Plymouth City Council

 

Stuart Road (eastbound)

Thursday 15 August

One lane closed on approach to Pennycomequick Roundabout, 7pm to 10pm

Lit sign repair works

Plymouth City Council

 

CURRENT/ONGOING WORKS

Beaumont Road

Until Friday 16 August

Two-way signals between Gasking Street and White Friars Lane, 24 hours a day (manually controlled at peak times)

Drainage works

Plymouth City Council

 

Chapel Street (Devonport)

Until Friday 6 September

Rolling multi-way signals from Park Avenue to St Aubyn Vicarage, 24 hours a day (manually controlled at peak times)

Gas main works

Wales and West Utilities

 

Church Hill Road

Until Friday 23 August (not including Wednesday 14 or Thursday 15 August)

Rolling two-way signals from Jennycliff Lane to Tapson Drive, 6am to 10pm

Footway works

Plymouth City Council

 

Colin Campbell Court

Until Sunday 1 December

Road closed at rear of Stroll on Baby, 24 hours a day

Works for new community diagnostic centre

DA Giles Ltd

 

Derriford Road (westbound)

Until Tuesday 13 August

Bus lane closed on approach to Plymbridge Lane, 24 hours

Gas main works

Wales and West Utilities

 

Laira Rail Bridge

Until Friday 19 November

Footway/cycleway closed, 24 hours a day

Remedial works  

Plymouth City Council

 

New George Street

Until Friday 4 October

Road closed between Old Town Street and Tesco Metro, 24 hours a day

City Centre Improvement Scheme

Morgan Sindall

 

New Street (Barbican)

Until Tuesday 13 August

Road closed, 24 hours a day

Shopfront repairs

Penquite Construction

 

Old Town Street

Until Friday 4 October

Road closed, 24 hours a day

City Centre Improvement Scheme

Morgan Sindall

 

Phoenix Street (southbound)

Until Saturday 30 November

Road closed from Sawrey Street to Millbay Road, 24 hours a day

Remodelling

ISG Construction Ltd

 

Plymstock Road

Until Tuesday 13 August

Two-way signals outside number 96, 9am to 3pm

Meter installation

South West Water

 

Savage Road

Until Wednesday 30 April 2025

Road closed between Kelly Close and Talbot Gardens, 24 hours a day

Regeneration works

Fred Champion Groundworks Ltd

 

Tavistock Road (outbound)

Until 4am on Sunday 11 August (nights)

Rolling lane closures from approach to Southway Drive to The Court and then from Woolwell Roundabout to Eco Way (all access maintained), 8pm to 4am

Cable recovery

BT

 

View all current and proposed works on the network on the roadworks map


This news story has been produced by Chesil Radio's News Team, for more information please visit: https://www.chesilradio.com


Comments


bottom of page